PROJECT DETAILS


IMPLEMENTING AGENCY : Department of Public Health Engineering
PROJECT CODE : 5111
NAME OF PROJECT : Groundwater Management and TPP for Survey, Investigation and Feasibility Study in Upazila and Growth Center Level Pourashava having no Piped Water Supply System.
APPROVAL STATUS : Approve DATE OF APPROVAL:
2007-11-04
NAME OF PD : Robin Raihan Ahmed
OBJECTIVES 1 : •Identify safe source with regard to quality especially arsenic contamination. • Conduct feasibility study for determining groundwater/surface source to make sure about quality of water as well as to ensure perennial source.
OBJECTIVES 2 : •Determine water demand and level of services and formulate design criteria to satisfy the basic needs. • Prepare a master plan for each town on water supply, sanitation and drainage issues
OBJECTIVES 3 : Carry out economic and financial analysis to determine the affordability of the beneficiaries and formulation of cost recovery mechanism including tariff strategy. •Prepare investment project(s) by involving concerned stakeholder.
PROJECT LOCATION : 148 nos. Pourashavas of the co
REPORTING PERIOD : 2007-07-01 to 2014-06-30
STARTING DATE : 2007-07-01 COMPLETION DATE : 2014-06-30
FINANCIAL YEAR : 2013 SOURCE OF FUND : GOB (JDCF)
: TOTAL GOB PA
PROJECT COST : 10015 10015 0
FINANCIAL INFORMATION
: TOTAL GOB PA
ADP ALLOCATION : 2876 2876 0
ADP RELEASE : 719 719 0
ADP EXPENDITURE : 380 380 0
RADP ALLOCATION : 0 0 0
RADP RELEASE : 0 0 0
RADP EXPENDITURE : 0 0 0
CUMULATIVE EXPENDITURE : 6075 PHYSICAL PROGRESS : 61 %
COMMENTS :

Khandker Mosharraf Hossain

Abdul Malek

Last Update Date

2017-12-18